Electrical parameters of the 220kV evacuation electric of the combined cycle power plant Lantarón (Gas Natural). Re-design

E. Pilo F.M. Echavarren

June 2008 - June 2008

Funding entity Elecnor


In order to perform protection adjustments of the substation Puentelarrá (Álava), it is necessary to calculate for both the aerial and the buried line the values of the impedances: resistance, reactance and capacity (direct and homopolar).